Moosilauke Cabin Revisited

May 28, 2010

Soon after the Crew Cabin Frame was cut and raised in October 2009 David and a number of volunteers worked hard to weather the structure in for the winter months. After the snow receded and we were sure that most of the cold air was gone from the mountain our crew returned to the site to install a porch addition, a canopy over the entry, siding to the cabin, and to finish the inside spaces with bunks, benches, shelves, paneling, etc. A dedication ceremony was held at the end of the month for the new MRL Crew Cabin.

Post and Beam Cabin, Moosilauke Ravine Lodge

The finished bunkhouse looking mighty

Porch of Timber Frame Cabin on Moosilauke

Crew Cabin porch

Dartmouth College Outing Club (DOC) Timber Frame

Inside the crew cabin

Crew Bunks in DOC Cabin

Bunkbeds inside the cabin

Post and Beam in Crew Cabin

Well braced