Soon after the Crew Cabin Frame was cut and raised in October 2009 David and a number of volunteers worked hard to weather the structure in for the winter months. After the snow receded and we were sure that most of the cold air was gone from the mountain our crew returned to the site to install a porch addition, a canopy over the entry, siding to the cabin, and to finish the inside spaces with bunks, benches, shelves, paneling, etc. A dedication ceremony was held at the end of the month for the new MRL Crew Cabin.
![Post and Beam Cabin, Moosilauke Ravine Lodge](https://timberhomesllc.com/wp-content/uploads/2013/01/crew-cabin-950x631.jpg)
The finished bunkhouse looking mighty
![Porch of Timber Frame Cabin on Moosilauke](https://timberhomesllc.com/wp-content/uploads/2013/01/porch--950x631.jpg)
Crew Cabin porch
![Dartmouth College Outing Club (DOC) Timber Frame](https://timberhomesllc.com/wp-content/uploads/2013/01/lounge-631x950.jpg)
Inside the crew cabin
![Crew Bunks in DOC Cabin](https://timberhomesllc.com/wp-content/uploads/2013/01/bunks-950x631.jpg)
Bunkbeds inside the cabin
![Post and Beam in Crew Cabin](https://timberhomesllc.com/wp-content/uploads/2013/01/bath-631x950.jpg)
Well braced